Projects

VA Amarillo Construct Primary Care Clinic

VA Amarillo Primary Care

The project involved constructing a new 20,000 sf Primary Care Building. Work included roads and parking lot areas, landscaping, utility work, demolition of existing sidewalks, and landscaping areas.

VA Loma Linda Cancer Center Building

VA Loma Linda Cancer Center

D Square Construction was the general contractor for this project, which consisted of the ground-up construction of a two-story 18,309 structural steel framed medical facility with poured concrete floors on “B” deck, with a combination of storefront glazing, metal siding, and stucco. The foundation is drilled piles and grade beams. The scope of work included site prep, and brining domestic water, fire suppression, electrical, gas, sewer, and telecommunications into the building.

VA San Diego Bldg 1, Halls & Walls II

VA San Diego D-B Halls & Walls II

D Square Construction was the Prime Contractor for this project which consisted of a design/build renovation to the interior corridor floor, wall finishes and ceiling, of the existing hospital main public circulation spaces on floors 2 through 6 at the San Diego VA. Scope of work included demolition; asbestos abatement; modifications to electrical, mechanical and plumbing systems; and relocation of fire protection system. This was all accomplished in an active hospital environment with strict infection control measures used.

VA Fresno MRI

VA Fresno MRI

The scope of this RFP encompassed the design and construction of a new MRI suite to include one new MRI suite, (1) Mechanical Room, one (1) Control Room, and one (1) Patient Changing Room.

The scope of work included preparing the site for MRI equipment installation and operations but not limited to removal of existing MRI, demolition of mechanical room, control room, MRI suite, haul away existing MRI equipment off site, removal of existing structures, and furnish labor and materials to construct and perform work for the new MRI suite, Mechanical Room, Control Room, Changing Room and Toilet.

VA Loma Linda Eye Clinic

VA Loma Linda Eye Clinic

The project involves the construction of a new @ 14,208 SF one-story ground-up new building that will serve as the New Eye Clinic for this campus. The site development for this new building will require the phased demolition of several existing structures and the relocation and installation of site utilities. The new building will primarily be steel frame on a spread footing / SOG foundation, with a stucco, metal panel, curtain wall storefront window, and “rainscreen wall” exterior, with the exterior elevations varying from 16’ to 30’. The new Building is designed to meet a minimum LEED Silver certification.

USN JBPHH Replace Secondary Clarifier at Building 1696

USN JBPHH Replace Secondary Clarifier at Building 1696

This MACC IDIQ Task Order project took place at Joint Base Pearl Harbor Hickam, Oahu, Hawaii. The project involved removal of the existing drive assembly and installation of a new drive assembly for Clarifier #1 at Building 1696, NAVFAC Hawaii Wastewater Treatment Plant.

Bidding

View our current projects bidding page to find links to all of the projects we are currently bidding.

Bidding

Subcontractors

Subcontractors

Thank you for working with D Square Construction LLC. View bidding projects, contracts and safety forms, as well as active projects here.

Plan Room Powered and Designed by Pantera Tools